Hi,
I am new to Silk Test and I am in POC phase. My question here is,
I have the silk test tool installed and I have say 3 test suites saved in my system. The application under test is running in another 3 systems. Is it possible to run the all the 3 test suites from my system in parallel by connecting to all the 3 target systems.