Can anyone think of a reason why the Select(Date) operation on the MonthCalendar Control class is no longer working in SilkTest for us? This was working for us in previous runs of the scripts (just last week) but it is no longer working. Other operations on the control (SelectToday, OpenMonthMenu, etc.) are working but for some reason we can no longer set the control to a specific date using the Select operation. We have not change anything in our baseline or configuration, simply rerunning the test. We are using SilkTest version 16.0.0.7469.
Thank You for any help.